Challenges
The producer turned to QLECTOR for a comprehensive solution that included:
Product Complexity
Managing a wide range of products demanded considerable time for production planning.
Schedule Adjustments
Adjusting schedules to the varying needs of recipes, changing between products and cleansing between operations.
JIT Delivery Issues
Implementing Just-In-Time (JIT) delivery was challenging due to the unpredictability of real-time demand and production line finalization.
Solution
The producer turned to QLECTOR for a comprehensive solution that included:
Inventory Forecasting
QLECTOR LEAP enabled more accurate predictions of inventory levels, facilitating just-in-time delivery and yielding up to 10 €/pallet in savings.
Automation
Streamlined the materials ordering process from remote warehouses through automation. Scheduling
Scheduling Optimization
Enhanced scheduling efficiency by considering variables such as color codes and realistic throughput times during the rinsing and cleaning stages.
Benefits
The producer turned to QLECTOR for a comprehensive solution that included:
Time Efficiency
A significant reduction of 75 hours per week for team coordinators and planners.
Organizational Improvement
A 25% decrease in organizational downtimes.
JIT Enhancement
A notable 10% improvement in JIT production.
Cost Savings
A substantial annual saving of 220.000 EUR.
Conclusion
DOMEL’s adoption of QLECTOR’s solutions showcases the powerful impact of advanced planning technologies in a traditional manufacturing environment. The significant time and cost savings achieved by DOMEL serve as an inspiring benchmark for similar enterprises seeking to optimize their production processes.
Keep following our use cases and blog posts to explore more about how innovative scheduling solutions are making waves in various sectors and driving companies toward a more efficient future.